A patient sits down and starts to explain why they came. Eleven seconds later, the doctor interrupts. That was the median found by a team of researchers who recorded real consultations in the United States. Doctors are trained listeners, under pressure of time, who believe they already know where the conversation is going. So are bid teams.
Lesson 7.4, Demonstrating Understanding of Client Needs, shows how to prove in the proposal that you understand the client: you-focused language, a confirmation of what the client needs, a solution tailored to it and evidence that it works. This report is about the step before the writing, the one the proposal depends on: actually hearing what the client needs, which is often not quite what the tender says, and rarely what the bid team assumed after the first reading.
- Let them finishMost people need less time to explain than we fear. The interruption costs more than the wait.
- Read the whyThe tender is the client speaking. The background, the weights and the answers say what matters.
- Name the jobBehind every requirement is a job someone needs done, and a person who will be judged on it.
What doctors taught us about listening
In 1984, Howard Beckman and Richard Frankel recorded visits to doctors and found that physicians usually interrupted patients within the first twenty seconds of their opening statement, and that most patients never got to finish it. Thirty-five years later, Naykky Singh Ospina and colleagues repeated the question with recorded encounters (2019). Clinicians asked patients about their agenda, the reasons for the visit, in only about a third of the consultations. When they did ask, they interrupted in most cases, after a median of eleven seconds.
The finding that is easiest to miss is the last one. Patients who were not interrupted finished their opening statement in a few seconds; in the 2019 study, the median was about six. Letting people finish costs very little. Interrupting them costs the part of the story the listener did not expect: the second concern, the real worry, the reason behind the reason.
How bid teams interrupt
- The capture meeting that becomes a pitch. The account manager meets the client before the tender and spends most of the hour presenting the company. The client's own description of the problem gets five minutes.
- The solution chosen on the first read. The solution architect reads the scope on day one and has a design by day two. Everything read afterwards is filtered through it.
- The words without the reasons. The tender asks for "24/7 support". The team answers with its support model. Nobody asks why the client needs it: a failed weekend migration last year, a new service for citizens, an audit finding.
- The template answer. The content library holds a strong "understanding of requirements" section, written for another client. It is reused, lightly edited, and evaluators recognise it as generic within a paragraph.
Listen before the tender is published
The best listening happens before the procurement starts, when conversations with the buyer are still open. In public procurement, the Directive allows contracting authorities to hold preliminary market consultations to prepare a procurement and to inform suppliers of their plans (Article 40). It also sets limits: where a supplier has been involved in preparing a procurement, the authority must take measures so that competition is not distorted (Article 41). Listen, ask, share expertise when asked; do not try to write the tender for the client.
In those conversations, borrow the doctors' technique for eliciting an agenda:
- Open with their problem, not your company. "What made you start this project now?" is a better first question than any slide.
- Let them finish. Do not interrupt the first answer, even if you think you know where it is going.
- Ask "anything else?" Physicians are taught this question for a reason: the first concern mentioned is not always the most important one.
- Reflect back. Summarise what you heard in their words and ask if you understood correctly. Carl Rogers and Richard Farson described this as the core of active listening (1957): showing the speaker that you have understood both the content and the feeling behind it.
- Write it down the same day. In the client's words, with the date and who said it, for the capture plan (Module 2).
Listen to the documents
Once the tender is published, the formal conversation goes through the procurement documents and the clarification process. The documents are the client speaking, and they say more than the scope:
- The background section. Why the contract exists, what happened before, what the client wants to change. It is often the most honest part of the tender.
- The weights. What the client cares about most is written in the evaluation criteria and their weighting (Lesson 7.3), not in the adjectives of the specification.
- The clarification answers. Other bidders' questions and the client's answers reveal concerns that were not in the original documents.
- The public record. Earlier contract notices, strategy documents, annual reports, audit findings and published minutes often explain the reason behind a requirement. Use only what is public.
Name the job behind the requirement
Clayton Christensen and colleagues (2016) argued that customers do not simply buy products; they "hire" them to get a job done, and the job has functional, emotional and social dimensions. The idea translates well to a contracting authority, because behind every requirement there are people with jobs of their own.
| Who | The job they need done | What they fear |
|---|---|---|
| Project owner | Deliver the new service on time, without disrupting the current one | A failed launch with their name on it |
| Finance | Keep the contract within the approved budget for its whole term | Change requests and price increases in year two |
| End users | Do their daily work faster, with less effort | A new system that makes their day harder |
| Procurement | Run a fair, compliant procedure that will not be challenged | A complaint, a delay or an annulled award |
The table is an example; each tender has its own people and its own jobs. Written down, they turn a list of requirements into a set of concerns the proposal can answer, in the order and the language that matter to the people who will read it.
Show that you listened
Lesson 7.4 gives the structure for the proposal: confirm your understanding, tailor the solution to it and provide relevant evidence. Listening makes each step specific.
- Confirm in their words. Restate the need using the client's own terms from the documents, not your product's vocabulary.
- Name the reason, not only the requirement. "You need 24/7 support because the new service will be used by citizens outside office hours" shows understanding; "we provide 24/7 support" shows a feature.
- Answer the fear. For each job in your map, say how your approach protects the person who will be judged on it.
- Stay within what is public. In a public tender, refer to the documents, the clarification answers and public sources. Do not quote private conversations in a way that suggests an advantage other bidders did not have.
Checklist
- Before the tender, client conversations start with their problem, and the first answer is not interrupted.
- Every conversation ends with "anything else?" and a summary checked with the client.
- Notes are written the same day, in the client's words, in the capture plan.
- The team reads the background, the weights, the clarification answers and the public record before choosing the solution.
- A needs map names the people behind the requirements, their jobs and their fears.
- The understanding section restates the needs in the client's words and gives the reasons behind them.
- Every claim of understanding is based on the documents or public sources.
- No section is reused from another client without being rewritten for this one.
Doctors interrupt because they are busy and because they think they know the answer. Bid teams do the same. Let the client finish, read the reasons behind the requirements and name the job each person needs done. The proposal that shows it heard the second concern, not only the first, is the one evaluators remember.
Sources
5 sources
- Beckman, H. B., & Frankel, R. M. (1984). The effect of physician behavior on the collection of data. Annals of Internal Medicine, 101(5), 692–696.
- Christensen, C. M., Hall, T., Dillon, K., & Duncan, D. S. (2016). Know your customers' "jobs to be done". Harvard Business Review, 94(9), 54–62.
- Directive 2014/24/EU of the European Parliament and of the Council of 26 February 2014 on public procurement, Articles 40 and 41.eur-lex.europa.eu/eli/dir/2014/24/oj
- Rogers, C. R., & Farson, R. E. (1957). Active Listening. Industrial Relations Center, University of Chicago.
- Singh Ospina, N., Phillips, K. A., Rodriguez-Gutierrez, R., et al. (2019). Eliciting the patient's agenda: Secondary analysis of recorded clinical encounters. Journal of General Internal Medicine, 34(1), 36–40.



